Dual PDUs, one going to each UPS, and each UPS is on a seperate circuit. This is good for redundancy.
Date: 01/28/2009
Views: 1561
|
The back of the BladeCenter rack. That fiber connection is temporary until we obtain the correct cables.
Date: 01/23/2009
Views: 1585
|
IBM BladeCenter H in ECS 202. Note two APC 5000VA UPSes. They are vastly oversized for this configuration, so we will be using them for additional equipment that requires good power redundancy.
Date: 01/23/2009
Views: 1646
|
This is the first time we use real PDUs. Power wiring is a lot neater and more convenient.
Date: 01/23/2009
Views: 1644
|
One of the newer racks in ECS210.
Date: 01/23/2009
Views: 1646
|
Servers in Tallahassee. Top to bottom: tally, sable, meerkat
Date: 12/17/2008
Views: 1642
|
The new tape changer holds the tapes in a space-efficient manner compared to the older one.
Date: 07/24/2008
Views: 1618
|
Fibrechannel Arbritrated Loop, 4Gbps baby! Note the other tape changer isn't yet connected, and is still on the old server.
Date: 07/24/2008
Views: 1707
|
The back of the setup.
Date: 07/24/2008
Views: 1619
|
Our new LTO4 backup system. Dell PowerVault TL4000 on the top (really a rebadged IBM System Storage TS3200), the new Dell backup server, and the older IBM LTO3 changer that's still plugged into the previous backup server (not visible).
Date: 07/24/2008
Views: 1588
|
I've been unpacking and labeling tapes!
Date: 07/24/2008
Views: 1405
|
Cisco 3750 switch + lots of cabling. Whee...
Date: 07/10/2008
Views: 1410
|
Stuff that's been unpacked and waiting to be unpacked
Date: 07/10/2008
Views: 1437
|
I'm going to put an admin workstation here once the rack gets installed.
Date: 07/10/2008
Views: 1530
|
The Dell 2950 and an APC 2200VA UPS.
Date: 07/10/2008
Views: 1557
|
Inside the 2950
Date: 07/10/2008
Views: 1683
|
2950 slid out on its drawer, opened.
Date: 07/10/2008
Views: 1660
|
Inside of the R900. CPUs on the right, RAM top and bottom, expansion slots in the middle. And lots of fans.
Date: 06/10/2008
Views: 1648
|
Inside the Dell R900
Date: 06/10/2008
Views: 1645
|
Back of the server rack
Date: 06/10/2008
Views: 1576
|
The server rack after adding the R900.
Date: 06/10/2008
Views: 1927
|
Comm rack in ECS 284.